NEW LOOK INFANTS CORRIDOR
The metro7 team is in charge of the improvement project for the Preschool building, with the aim of enhancing the children’s comfort to improve their academic performance.
Last year, we inaugurated the fabulous Outdoor Learning Spaces – our multifunctional outdoor spaces for specific activities related to the educational program of the school. This summer, a significant investment in air quality and climate control has been made, with a system designed specifically for the school to allow for individualised control and regulation through a highly efficient heat recovery system. There has also been a complete renovation of the bathrooms, tailored for the little ones, as well as a much more cheerful look for the central area of the building.